CAPEX of US$545.5 M includes a contingency of US$49.59 M (10%)
Mr Pei and CATH are backing the development of the project.
An additional 50 to 100 Million on 4.5 mtpa ?? becomes irrelevant to the long term benefits to CATL / YIBIN in advancing the project.
The guy is worth over 8 billion US .
ALL IMO
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-53015
-
- There are more pages in this discussion • 31,102 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)