I was doing some rough calculations.
With the 9 5\8 inch casing having an ID of 226.6 mm.
The drill would need to fit through, say 215 mm for dia of annulus.
Its 1177 meters from the 9 5\8 casing to the TD.
With the 5 1\2 inch producing casing having an ID of 125.7
That would need 36 cubic meters of cement to fill the annulus up to the 9 5\8 casing.
And if they did use 36 cubes the 5 \15 production casing would be filled to approx 1324 meters below the surface
Could that be correct???
And I guess that the drill crew got it to the milling well before the cement had time to cure. So maybe not too hard.
Sorry about the inches and millimeters thing...lol
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-332
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online