TOE 1.67% 29.5¢ toro energy limited

Banter and general comments, page-699

  1. 700 Posts.
    lightbulb Created with Sketch. 249
    Different situations, Vimy's secondary approval for Works Approvals, Mining Proposal / Mine Closure Plan and were delayed due insufficient information supplied. Toro is currently doing a Engineering Study include Vanadium as a by-product in its processing, due to this being a change in thier current permits it will need to be amended and submitted for assessment. If approved the current permit will be extended another 5 years. This is common in the mining industry as new mineral resources and technologies are found or implemented before and after mining has started.

    I don’t think a company will want to just let its main asset be worth nothing to them.

    Approval Timeframes

    https://hotcopper.com.au/data/attachments/3674/3674409-17c3b924cafff4e5c06400546520c36c.jpg
    Last edited by turtlespeed: 11/10/21
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.