FMG 1.47% $18.24 fortescue ltd

Forrest to build massive hydrogen, wind, solar and cabling factory in Queensland, page-100

  1. 7,705 Posts.
    lightbulb Created with Sketch. 2797
    "Forrest’s plans are – as usual – extremely ambitious. The six-stage project will start with a plan to establish Australia’s first multi-gigawatt-scale electrolyser factory, with an initial capacity of 2 gigawatts (GW) per annum – more than doubling current global production."


    It's a gimmick to suck in the gullible and stupid.

    2GW = 2 million KW/year = 228KW/hr continuous operation. That is enough to power about a handful of cars or 20 houses.

    Considering that >95% of hydrogen is produced by Methane Reforming 'doubling' hydrogen production by electrolysis is meaningless.

    Just more 'greenwashing' BS from corporations.
    Last edited by PigsMightFly: 12/10/21
 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.