would consider the results “promising” as opposed to “outstanding”. Enough to justify further drilling.
The original programme details were: “ A reverse circulation (RC) drilling program commenced in June 2009 and comprised 27 holes for 2,620m total drilling.”
It is not clear whether the other drilling had no significant intercepts, or results are still pending.
DYOR.