AEV 0.00% 1.1¢ avenira limited

a new old preso out, page-12

  1. 3,648 Posts.
    I think it was mentioned as another possibility, however a slurry line is expensive (and therefore not a MAK imperative) and of limited use. A rail line is also expensive, but at least it can have other users and therefore income.

    We will have to wait and see, however it was good to see the production schedule has not changed (or at least not much) still mid-2010...
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.