ADG 0.00% 0.4¢ adelong gold limited

Ann: Quarterly Activities/Appendix 5B Cash Flow Report, page-5

  1. 3,540 Posts.
    lightbulb Created with Sketch. 651
    I think that all drill holes have been reported on.

    I was mistaken thinking there were a few more to come.

    The proposed holes outside the challenger area were deffered.

    After an inspection of the 5 drill sites selected at the Caledonian Gold Project, the ground was found to be poor
    as a result of recent rains and so unsuitable for drilling during this program. These drill holes will be deferred until
    the next drilling program.

    I would suspect that the feasibility, finance etc. will be in a seperate report, to be released soon ( hopefully)

    DDD have already advised that the project is considered commercially viable.

    Where to next ? I guess we will find out soon.
 
watchlist Created with Sketch. Add ADG (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $4.471M
Open High Low Value Volume
0.5¢ 0.5¢ 0.4¢ $6.616K 1.423M

Buyers (Bids)

No. Vol. Price($)
38 27131008 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 6708608 6
View Market Depth
Last trade - 15.47pm 19/07/2024 (20 minute delay) ?
ADG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.