@jctrout, you are correct, i was too lazy to open the anns and went from memory
Assuming entire 5.5" liner was full of cement, around 32,500l or 200 bbl of cement was displaced into the annulus.
...the annular volume b/w 8.5" hole and 5.5" liner? - 21.3 l per metre according to tables.
So that means around 1438 m of annulus was filled above the 4220 mark (ive allowed for cement in the base 54 m of hole) . i.e. cement went up to 2782 m depth. If you look at@Ya earlier post, the cement would have made it into the 9" casing (set at 3,097m), assuming im correct. (ive not altered volume for 9" casing, i just wanted to see whether it made it to the 9" casing.
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-46
-
- There are more pages in this discussion • 152 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NWE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online