For those who have a technical background in drilling, is the well a low risk of being abandoned given the milling job was successful? Is the remedial cement job a difficult process or is it as simple as adding to the existing cement? Just trying to get a better understanding of where we are at from those with technical experience in the field.
- Forums
- ASX - By Stock
- NWE
- Ann: Lockyer Deep-1 Operational Update
Ann: Lockyer Deep-1 Operational Update, page-112
-
- There are more pages in this discussion • 86 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)