BRK 0.00% 1.2¢ brookside energy limited

Banter and General Comments .. BRK, page-2133

  1. 3,162 Posts.
    lightbulb Created with Sketch. 7500
    Guys, we need to get our concepts right.

    Production cost and breakeven cost are two separate costs , but production cost is part of the breakeven cost calculation.

    1) Production cost is the cost it takes to get the BOE out of the ground and onto market, is $ per barrel or cents per MCF or $ per BOE.

    2) Breakeven cost is the $ number per barrel, per MCF or per BOE that needs to be achieved for the company to get all it's money back spent on a particular project. That is a total cost number and includes , land acquisition costs, drilling costs, legal etc. Additionally, the costs to keep the well/ wells operating such as production costs, taxes, royalties, and gathering and compression costs, toilet paper etc, EVERYTHING are included . That number is derived by adding all expenses incurred , expected costs over the well lifetime and dividing that by the EUR or initial reserve that is expected to be produced over it's lifetime.

    BRK have guided production costs at ~US$5-8 per BOE, where it will be a lower number in early production when the wells produce at greater flows and increases as production rates drop over time.

    BRK have guided it's break even cost at ~US$ 25 -US$30 per BOE.... So if , just for example, the company spends US$ 9 million to drill, lease costs of US$ 1.5 million, legal , royalty at 20%, taxes, GG&A estimates etc for a total spend of US$ 50 million for a well, including the production cost and the well has 2.0 MMBOE reserves, it's break even cost will be estimated to be US$50/ 2 million BOE or US$ 25 per BOE.


    Hope that makes some sense.

    Cheers

    Dan
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $57.17M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $17.29K 1.441M

Buyers (Bids)

No. Vol. Price($)
23 14643724 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 21909046 20
View Market Depth
Last trade - 16.10pm 27/06/2024 (20 minute delay) ?
BRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.