NVA 3.70% 13.0¢ nova minerals limited

Ann: Maiden Gold Resource of 1.5 Million Ounces at RPM North, page-91

  1. 11,249 Posts.
    lightbulb Created with Sketch. 29637
    I think Korbel as a base for operations needs to be up and running and in steady-state production for 3-4 years before they consider adding ounces from RPM. That would be mining of RPM from perhaps 2030 if they can get Korbel producing by 2026.

    The feasibility study work for Korbel should consider some metallurgy and floatation testwork for drill samples at RPM. Important as it may impact design decisions for the plant to be located at Korbel. Hopefully they will do some test work for RPM samples next year ( although maybe better to wait until they have also drilled RPM south ). Test work will be probably be needed for a future indicated resource.
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
(20min delay)
Last
13.0¢
Change
-0.005(3.70%)
Mkt cap ! $31.66M
Open High Low Value Volume
13.0¢ 15.0¢ 13.0¢ $24.17K 185.0K

Buyers (Bids)

No. Vol. Price($)
2 99999 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 30000 1
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
NVA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.