E25 19.1% 25.0¢ element 25 limited

The Dawn of EV, page-945

  1. 2,784 Posts.
    lightbulb Created with Sketch. 6110
    Which raise the interesting question - assuming they are close to having enough ore for another ship in the 55-60kt range, do they try and get the ship away as soon as possible?

    A 55-60kt ship leaving at the end of November is consistent with at or above 20kt of production/mth. If they got a 60kt ship away before the end of November, production has clearly improved beyond 20kt/mth. If shipping prices are falling, the sooner its shipped, the higher the likely CIF/FoB adjustment.

    If they decide to defer the next ship into December, releasing some solid production volume information is basically essential. None of this "over 20,000" stuff, because the default position a skeptical market would take is that achieving name plate production is going to be very difficult and they are yet to even hit 20kt/mth.
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
25.0¢
Change
0.040(19.1%)
Mkt cap ! $54.97M
Open High Low Value Volume
21.5¢ 26.0¢ 21.5¢ $22.23K 90.37K

Buyers (Bids)

No. Vol. Price($)
1 35000 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
26.5¢ 20000 1
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.