Back in Perth. World shipping threw a spanner in the works. The last piece, the vibrating screen has finally arrived. Steel worker will be back Monday to complete the steel works. Estimated time for steel works finished is 3 weeks. Electrical works hopefully sorted within the same time frame. Then good to fire the plant up and set the feed along with water flow.
I will be back out in a couple of weeks to bring back 30 tonne. I will just miss them.
- Forums
- ASX - By Stock
- GIB
- Ann: Phase 5 Drilling Grows Neta Gold Prospect - 23m @ 1.61g/t
Ann: Phase 5 Drilling Grows Neta Gold Prospect - 23m @ 1.61g/t, page-39
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GIB (ASX) to my watchlist
|
|||||
Last
4.0¢ |
Change
0.004(11.1%) |
Mkt cap ! $8.460M |
Open | High | Low | Value | Volume |
3.8¢ | 4.0¢ | 3.7¢ | $1.983K | 53.31K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100026 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 102040 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100026 | 0.037 |
1 | 6394 | 0.036 |
1 | 28286 | 0.035 |
1 | 500000 | 0.025 |
2 | 111000 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 102040 | 1 |
0.044 | 200000 | 1 |
0.050 | 171979 | 3 |
0.056 | 20000 | 1 |
0.070 | 30000 | 1 |
Last trade - 15.36pm 26/07/2024 (20 minute delay) ? |
Featured News
GIB (ASX) Chart |