BOE 1.76% $4.05 boss energy ltd

Nuclear Power, page-124

  1. 3,130 Posts.
    lightbulb Created with Sketch. 115
    So they have dug them all up? rolleyes.png Do you honestly believe that it will be economical to retrieve them from usually 100s of kms out in the boon docks? and process them? They cant even recycle plastic crap or car tyres right where they are replaced.
    I bet they wont shred the stainless fittings (and they wouldn't want to) and it certainly wont be economical to deconstruct them..
    The mountings and leading edges would also need to be removed as well depending on the construction technique.
    Most of the additives they have tried to put in concrete over time have failed or havnt been economical. EDE spent years and years getting carbon nanotubes approved for use in various applications. The blade material will be contaminated with resins, moisture and other impurities that have been blasted into them by over 200km/h wind impact speeds. And there is still a 500 tonne block of concrete sitting where the tower was.....
    Be realistic and please keep up to date.....rolleyes.png
 
watchlist Created with Sketch. Add BOE (ASX) to my watchlist
(20min delay)
Last
$4.05
Change
0.070(1.76%)
Mkt cap ! $1.656B
Open High Low Value Volume
$3.98 $4.06 $3.95 $12.21M 3.046M

Buyers (Bids)

No. Vol. Price($)
1 1000 $4.04
 

Sellers (Offers)

Price($) Vol. No.
$4.05 17683 6
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
BOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.