Ok so some quick back of envelope gross figures:
Plannned initial production of 5MT pa at 1.65% and a long term avg price of $1000 per tonne = $82.5 million dollars gross pa.
JORC resource of 400MT at 1.65% = $6.6 billion dollars gross
JORC proved and porbable reserve of 132MT = $2.178 billion extra in ground (potentially)
https://static1.squarespace.com/static/5934d2ae6b8f5beeb5ba23f3/t/61962691b14d634e6f04f21c/1637230273796/AGM Presentation 18112021.pdf
Then there is tin at USD $38000 per tonne
https://tradingeconomics.com/commodity/tin
Tantalum at USD $158,000 per tonne
https://www.statista.com/statistics/1009173/tantalum-price/
Hydroxide currently priced at USD $29,000 per tonne
https://www.lme.com/Metals/EV/Lithium-prices
Huge numbers for a project whose resource should triple in size once further drilled and JORC'd down the track..
- Forums
- ASX - By Stock
- AVZ
- Running discussion on SP
Running discussion on SP, page-57835
-
- There are more pages in this discussion • 24,945 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online