What are you talking about?
You posted this note that dates from 2012.NAMA expects to lodge and exploitation application in 2016 in co-operation with one of the leading smelter groups in the world.
NAMA is responsible for:
- Design build and operation of the new mine
- Geological work
- Remodelling of existing resource models
- Feasibility studies on reopening the mine
- Environmental assessment preparation
- Social impact assessment preparation
- Field work and water analysis
- Reassessment of old drilling cores
I wonder whether you could tick those jobs done between 2012 and the sale by Cerium in 2021.
And was the exploitation licence application lodged in 2016. If not, why not?
- Forums
- ASX - By Stock
- EPM
- Ann: Ivittuut Drill Samples Confirm High-Grade Rare Earth Results
Ann: Ivittuut Drill Samples Confirm High-Grade Rare Earth Results, page-109
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EPM (ASX) to my watchlist
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $18.00M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $1.641K | 205.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2438572 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 926837 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2438572 | 0.007 |
6 | 3782472 | 0.006 |
7 | 4351145 | 0.005 |
3 | 2487888 | 0.004 |
4 | 2591666 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 926837 | 1 |
0.009 | 1350000 | 2 |
0.010 | 4919967 | 7 |
0.011 | 2342422 | 2 |
0.012 | 592895 | 3 |
Last trade - 14.54pm 15/07/2024 (20 minute delay) ? |
Featured News
EPM (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online