Centrifuge wasn't separating materials correctly. Now it is, but I assume not at full capacity.
They are still in the ramp up phase. They are at a point where they could run the plant continuously and make SOP, but they won't be doing that. They have to start / stop and tweak things until everything is at full nameplate production.
This is all part of the ramp up. Ramp up stage doesn't end until March 2022, but it seems like they are well ahead of schedule.
- Forums
- ASX - By Stock
- KLL
- Ann: Investor Presentation - 2021 Annual General Meeting
Ann: Investor Presentation - 2021 Annual General Meeting, page-8
-
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $174.4K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable