TLG 15.8% 66.0¢ talga group ltd

Europe Permits and Finance, page-49

  1. 1,105 Posts.
    lightbulb Created with Sketch. 308
    For environmental reasons and to not get into a fight with the sami and others, I am certain that further mines and expansions will all be under ground. And we need to ramp ore mining to ~400ktpa by 2025 and eventually ~10mtpa ore somewhat after 2030. I expect all the expansions to be under ground as I dont see a way to get permission for surface mines of that scale. We need someone we can trust and work well with. I still hope LKAB can be that partner, as a contractor but not as a JV partner. It would still fit well. Maybe Boliden but I dont know much about them. I dont think any other mining company would do because they need to operate within Swedish juristication and thats gonna be hard for any outsider. So we are gonna go with one of the two.

    On the topic of 1m depth slice gives you one year of mining result. Ok, lets use a calculator. I dont know how dense the material is that we mine. But probably somewhere between 3 and 4 g/cm³. Lets plop in the numbers:
    100 kt = 100'000 t
    3 g/cm³ = 3 t/m³, 4 g/cm³ = 4 t/m³
    100'000 t / 3 t/m³ = 33'333 m³, 100'000 t / 4 t/m³ = 25'000 m³
    50 m wide strip, 1 m depth = 50 m² * length
    33'333 m³ / 50 m² = 666,66 m long strip
    25'000 m³ / 50 m² = 500 m long strip

    So we have to mine a strip of length between 500 and 666 meters to get to the production of 100ktpa ore and reach our initial vittangi target. 2 people with a shovel can do that easily (joking)

    At least for Vittangi, that sounds pretty good. But we still cant do that to the entire ressource. As we expect, Niska and Nunasvaara north, east, south are likely all connected under ground. And it would make sense to make a giant mine out of that, under ground. Still needs a strong and trustworthy partner. We need to get people on board. The sooner we have the partners in place, the sooner we can ramp up production. Its all about timing. Talga needs a burning sense of urgency.

 
watchlist Created with Sketch. Add TLG (ASX) to my watchlist
(20min delay)
Last
66.0¢
Change
0.090(15.8%)
Mkt cap ! $250.6M
Open High Low Value Volume
58.5¢ 66.5¢ 58.5¢ $1.315M 2.104M

Buyers (Bids)

No. Vol. Price($)
2 4903 64.0¢
 

Sellers (Offers)

Price($) Vol. No.
66.5¢ 10000 1
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
TLG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.