88E 0.00% 0.2¢ 88 energy limited

Ann: Merlin-2 Operations Update, page-17

  1. 9,081 Posts.
    lightbulb Created with Sketch. 1064
    The latest from Petroleum News, apologies if previously posted.

    https://www.petroleumnews.com/pntruncate/704533413.shtml

    A bit more detail on the snow road construction

    "In the Dec. 8 interview Opstad said they had received state, federal and North Slope Borough approvals to begin pioneering (same as the prepacking that’s done for ice roads) of the 111-mile snow road between KRU 2P and the Merlin 2 well location.“We already have people working across the Colville River,” he said. Using track vehicles, they are building ramps down the east side of the Colville and up the west bank and beyond."

    Happy Friday,

    cheers
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $2.871K 1.430M

Buyers (Bids)

No. Vol. Price($)
237 229711066 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 542559084 199
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.