The last dot point got me up!
DRILLING COMMENCES AT KALMAN
• Drilling has commenced at Hammer’s Kalman copper/gold/molybdenum
and rhenium project
• Kalman is the first target in Hammer’s drilling program which will also include
drilling on the Mount Isa East JV along the Trafalgar trend, and at Hammer’s
100% owned prospects Neptune, Sunset and near Lakeview
• Drilling will continue up until the Christmas break with a return planned on 5th
January 2022 (weather dependant)
• Drilling at Hammer’s Bronzewing South project has now been completed.
13 holes for 3,554m of reverse circulation drilling was completed in a target
corridor immediately south of the Bronzewing Gold mine
• All samples have been submitted to the laborator Results from
this program are expected later this month
- Forums
- ASX - By Stock
- HMX
- Ann: Drilling Commenced at Kalman
Ann: Drilling Commenced at Kalman, page-2
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
-0.001(2.56%) |
Mkt cap ! $33.68M |
Open | High | Low | Value | Volume |
3.9¢ | 4.0¢ | 3.8¢ | $54.19K | 1.400M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 35015 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 328045 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 35015 | 0.038 |
3 | 197990 | 0.037 |
1 | 200000 | 0.036 |
2 | 349999 | 0.035 |
3 | 175000 | 0.034 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 328045 | 4 |
0.041 | 55000 | 1 |
0.042 | 246000 | 2 |
0.043 | 231750 | 3 |
0.044 | 625703 | 3 |
Last trade - 15.35pm 04/10/2024 (20 minute delay) ? |
Featured News
HMX (ASX) Chart |