I havent determined that yet. I presumed it was the 2018 event that caused the SP to plummet. Thatll usually do it.
Are they looking at having a pilot plant running by mid next year, or is that the same pilot program they refer to in recent anns when referencing the on-going work at ALS Perth and in the USA. The recent anns of the high purity results mentions a pilot program numerous tines - is that part of THE pilot program or will they be constructing a pilot plant to demonstrate the process etc? sorry everyone - I know COVID messed everyones forecast dates up so I'm just trying to lay it out. Its pretty good results that they have managed to meet their goals wrt the product. Thats where the money has gone as well as the studies along the way, and it makes sense, without those results the project wouldn't work.
- Forums
- ASX - By Stock
- AVL
- Ann: VSUN Energy to Install VRFB at Water Corporation Site
Ann: VSUN Energy to Install VRFB at Water Corporation Site, page-42
-
- There are more pages in this discussion • 89 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.1M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.6¢ | $31.38K | 1.963M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
73 | 16062227 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 7671052 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
67 | 15525799 | 0.015 |
71 | 48777074 | 0.014 |
25 | 7568285 | 0.013 |
13 | 3609998 | 0.012 |
12 | 6127388 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 7636552 | 5 |
0.017 | 11575670 | 33 |
0.018 | 5293892 | 13 |
0.019 | 3847464 | 8 |
0.020 | 13464361 | 15 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
AVL (ASX) Chart |