The NS 377-3 field development well (Beach 20%) has intersected a 140 metre
gross oil column (20 metres greater than prognosed) in the Kareem Formation
reservoir and is being cased as a future oil producer. NS 377-3, the first
production well for the field, has been drilled from an onshore location to
intersect the offshore oil pool 150 metres north of the GH 377-1 discovery well.
Production from the 377 field is expected to commence into the Ras Ghara
facility, 7 km to the north west of the 377-3 well location, in early 2010
- Forums
- ASX - By Stock
- BPT
- egypt - at last!!
egypt - at last!!
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.14 |
Change
0.005(0.44%) |
Mkt cap ! $2.606B |
Open | High | Low | Value | Volume |
$1.16 | $1.16 | $1.14 | $1.399M | 1.228M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
47 | 381072 | $1.14 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.14 | 147361 | 40 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
44 | 355616 | 1.135 |
40 | 508687 | 1.130 |
20 | 262270 | 1.125 |
17 | 227396 | 1.120 |
10 | 122622 | 1.115 |
Price($) | Vol. | No. |
---|---|---|
1.140 | 153906 | 40 |
1.145 | 258697 | 26 |
1.150 | 197264 | 22 |
1.155 | 275356 | 19 |
1.160 | 175143 | 16 |
Last trade - 13.12pm 18/09/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |