Hello, is the ML and CATL percentage of 24% to be applied to the 450 Mt Roche Dure mine or to the total length of 13.5 km Manono area?
The Manono area Kitotolo Sector current mine 450 Mt. all calculations are currently based on this and also the valuation of the marketcap. However, there is also the Manono Sector which lies to the north on the total project length of 13.5 km. Both sectors are estimated to have a total volume of 1300-1800 mt. Why not also plan a mine in the north? Shouldn't the market upgrade AVZ to 1300-1800 mt, our valuation should be much more than current, currently only the 450 mt is considered. The plans are for the 450 mt Roche Dure project, what will happen to the remaining pegmatites, will they be sold and others mine them?
Or is a 40 Mt plant for the Kitotolo and a 40 Mt plant for the Manono Sector being planned in the background with the help of large mining companies?
AVZ Price at posting:
89.5¢ Sentiment: Buy Disclosure: Held