2 main sequences could be followed but if they do what they did in Snatcher 2 it is:
Drill through the target - slow down and control drill with shows.
Finish drilling well if a DST is not needed (i.e. the shows and results are mostly what is expected)
Run logs - get the logs analysed while geos update their cross sections and maps.
Finish information gathering in the well (side wall cores and seismic check shots are possible but I believe were not done in Snatcher 2)
*****This is where we are at*****
Most important decision - case or abandoned
Looking at the reports a cased well seems likely. The rig would go away (down to MHL/VPEs Fury-1 I believe) while VPE would prepare site for production and perforate with a wireline rig (timing unknown but a few weeks is normal).
- Forums
- ASX - By Stock
- ITC
- news
news, page-14
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ITC (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online