They r into the business of drilling now at B-10.
Basically after they've run the 9" casing joints,
- they'll pump cement into the annulus, wait on it to set,
- Perform pressure testing,
- Makeup 8.5" BHA with a new Drillbit & MWD tool,
- Drill out the cement float shoe etc & drill ahead towards the Elang target sands,
- Lithology should b claystone instead of the monotonous Calcarenite sequence.
The MWD tool will pick up any change in Resistivity when they hit any Oil in the RAB sands & the Gamma should drop thus indicating the top of Elang.
Once they drill thro' that section to TD, they'll run full suite of Wireline Logs etc & do the usual MDT pressure testing & sampling, calculate the Oil Water Contact, net-gross pay thickness, porosity, movable HC's etc etc.
Not long to go, hopefully no more Tropical storms. GLTA & safe drilling ahead.
------
Santos Qtrly is on the 20th of Jan, so we should get an indication of how they were going at Dancer-1, prior to releasing the Tom Prosser rig for drilling Pavo-1.
- Forums
- ASX - By Stock
- CVN
- advance Energy up
advance Energy up, page-45
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.010(6.45%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
15.5¢ | 16.5¢ | 15.5¢ | $201.4K | 1.258M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 888369 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 1476114 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 888369 | 0.155 |
19 | 1245634 | 0.150 |
19 | 860361 | 0.145 |
11 | 597422 | 0.140 |
2 | 437000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 1476114 | 9 |
0.170 | 690959 | 13 |
0.175 | 944490 | 9 |
0.180 | 597382 | 9 |
0.185 | 92057 | 3 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |