One thing I am a little concerned about is the degree to which a commercial scale plant can be tested in the absence of a realistic load. My suspicion is that you can't easily provide an appropriate dummy load for a 25 MW generator.
I am not enough of an engineer to know if a 25 MW plant can be tested to the satisfaction of either engineers or financial analysts without a grid connection or other power user. The township of Innamincka would have to buy a lot of neon lights and freezers to use up 25 MW!
I think the possibility of a 25 MW plant that has been test run but which cannot be run continuously until the investment is made in the transmission is quite real.
Anyone understand power engineering enough to give us a read on this? Maybe a question for the AGM.
- Forums
- ASX - By Stock
- RNE
- gdy a thumbs up!
gdy a thumbs up!, page-17
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RNE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
-0.001(33.3%) |
Mkt cap ! $1.727M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.1¢ | $1.024K | 522.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
115 | 187681496 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 49393848 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
112 | 181181496 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 49393848 | 14 |
0.003 | 20427774 | 21 |
0.004 | 2753578 | 6 |
0.005 | 1201800 | 3 |
0.006 | 269000 | 1 |
Last trade - 14.19pm 08/11/2024 (20 minute delay) ? |
Featured News
RNE (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online