FBR 2.13% 4.6¢ fbr ltd

Willagee Builds, page-320

  1. 3,120 Posts.
    lightbulb Created with Sketch. 1447
    There is a concrete pump at the southern end of the construction type. It looks like it is laying the next 2 slabs. Though is could be pouring slabs to go onto the first 2 builds. The road was blocked and I didn't bother parking and walking over to determine for sure.

    At the northern end where there is a single slab laid, Telehandler #2 is on site. So expect Hadrian to be there tomorrow.
    The guys were prepping the slab.
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.