SO4 0.00% 31.0¢ salt lake potash limited

Class Action/Lawsuit against SO4/Board, page-224

  1. 1 Posts.
    This may not relate to a class action at all, but they are details on what happen to our money.
    In the last week have spoken to two sparkies who worked on the project . These are some comments they made:
    1. The Civil contractors had no experience in this type of work. They lost at least two excavators in the mud through lack of understanding of the environment in which they were working.
    2. The electrical contract was "Cost plus". Without a hard dollar contract there is little incentative to acheive decent productivity. I surmise that other contracts would have been made on the same basis
    3. There was a LOT of wasted $$. eg. The distribution boards were airconditioned (this occurs nowhere else in the Pilbara). The Switchrooms were twice the size of others in the Iron Ore mines in the Pilbara. Not only was this not required, the transport cost would have been massive
    4. They did not seal (ie. put covers on) the concentrate tanks. Nor did they build the storage shed to be sealed. With the frequent willy-williys, the product was full of red dust
    5. They could not remove the salt from the product effectively. I don't know the issue causing that.
    6. The workforce had to be evacuated by helicopter after one cyclone came through as the camp was flooded. It seems the accomodation was built in an area subject to flooding.

    These issues were relayed in only a three minute chat. It would appear there was major incompetance in the engineering.
 
watchlist Created with Sketch. Add SO4 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.