Hi batman13,
MAY are probably just including the N Structure's NW Block in their Alameda drilling resource estimate due to the potential that the N Structure's internal thrust fault is sealing and thus the SW Block will require an appraisal well - albeit obviously if NW Block is a success then the SW Block becomes IMO very low risk.
IMO two sealing models potentially exist for the "Greater" N Structure, on the basis of the oil shows in Alameda-1 translating to reservoired oil, one being the Model below and the second having the SW Block's SW thrust fault sealing - I'll post on this later today.
In relation to your query on the N Structure's SW Block and the Zapato structure - I would say no - the key for the N Structure's SW Block's contingent resource position solely lies with what happens in the N Structure's NW Block
Hope this helps.
Cheers
VOGC
- Forums
- ASX - By Stock
- MAY
- Ann: Drilling update at Alameda-1 - Significant Oil Interval
Ann: Drilling update at Alameda-1 - Significant Oil Interval, page-282
-
- There are more pages in this discussion • 307 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
-0.001(4.35%) |
Mkt cap ! $74.14M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.2¢ | $41.26K | 1.791M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 1303214 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 280000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 1303214 | 0.022 |
15 | 2343584 | 0.021 |
21 | 3971251 | 0.020 |
6 | 1029920 | 0.019 |
3 | 566369 | 0.018 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 280000 | 3 |
0.024 | 4580550 | 11 |
0.025 | 1095997 | 8 |
0.026 | 2095955 | 3 |
0.027 | 1000000 | 1 |
Last trade - 16.10pm 19/08/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |