334m a day drill rate / 9000m left in drill program
No delays from rig down time or weather included.
I thought a heard bruce hinted at drilling the other tenaments later in the year so i wonder if they fall under the same permit issues or the same permit.
- Forums
- ASX - By Stock
- GTR
- Ann: Recommencement of Drilling at Thor ISR Uranium Project
Ann: Recommencement of Drilling at Thor ISR Uranium Project, page-11
-
- There are more pages in this discussion • 67 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
-0.001(11.1%) |
Mkt cap ! $11.84M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $6.757K | 1.709M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
43 | 27161078 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 4360229 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
43 | 27161078 | 0.003 |
25 | 44532478 | 0.002 |
8 | 18799950 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 4360229 | 1 |
0.005 | 15889161 | 22 |
0.006 | 8199831 | 11 |
0.007 | 8728854 | 7 |
0.008 | 5282500 | 6 |
Last trade - 15.31pm 07/11/2024 (20 minute delay) ? |
Featured News
GTR (ASX) Chart |