Feel Better:Complain About Anything, page-80330

  1. 63,437 Posts.
    lightbulb Created with Sketch. 731
    Railway line between SA and WA has finally been fixed and reopen after 3 weeks of repairs to damage cause by floods, big back log of freight has been held up but expected to get moved quickly with trains up to 1.8 km long. LOL imagine getting caught at a rail way crossing when one of those go past.

    I have a pallet of stock that is on that train.

    None too soon, supermarket shelves have become bare and I expect it will take 1-2 weeks for shelves to get restocked
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.