Flow rates:
Gas production from the Bibblewindi multilateral pilot is currently sitting at 470,000 standard cubic feet per day.
Water production continues at approx. 3000 barrels per day.
- Forums
- ASX - By Stock
- ESG
- pre open!
pre open!, page-3
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)