MAY 4.55% 2.1¢ melbana energy limited

Ann: Forward work program for Block 9 drilling program, page-31

  1. 18,783 Posts.
    lightbulb Created with Sketch. 2643
    And people (investors) should note, there is NO "IF" applicable or "IF" warranted in relation to the N Structure.

    Contrast the distinction between the two sentences:

    Flow test the oil interval in the N Structure!!!

    Flow test any oil interval that may be encountered in the Alameda Structure (if applicable and
    if warranted
    ).

    To me, it means there is certainty with the N structure now!!!


 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.001(4.55%)
Mkt cap ! $70.77M
Open High Low Value Volume
2.2¢ 2.2¢ 2.0¢ $165.4K 7.793M

Buyers (Bids)

No. Vol. Price($)
3 520426 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 1129165 6
View Market Depth
Last trade - 16.10pm 06/08/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.