re: Ann: Phase 3 Drilling begins at Murphy Ur... "Hole MURD015 is a 290 metre stepout to the east which will test the position of the altered mafic intrusive in a zone of demagnetisation at a shallower target depth to that intersected in hole MURD002
Hole MURD016 is a 270 metre stepout to the south which will test a zone of demagnetized, altered and copper-anomalous mafic intrusive which was originally intersected at 52 metres in a shallow RAB scout hole."
Good luck holders.
- Forums
- ASX - By Stock
- BOM
- Ann: Phase 3 Drilling begins at Murphy Uranium Pr
Ann: Phase 3 Drilling begins at Murphy Uranium Pr, page-2
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BOM (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online