MAY 11.5% 2.3¢ melbana energy limited

Ann: Forward work program for Block 9 drilling program, page-105

  1. 1,826 Posts.
    lightbulb Created with Sketch. 762
    Hi Alexei,

    not sure if the N structure is Alameda itself. Marti 5 drilled through Alamada down flank 30 years ago, but likely not the N structure. Alameda 1 surface location is a few k's west of Marti 5, hence to clip the N structure. Looks like we may have a large oil field in N alone. 100% success rate is a good start in this neighbourhood

    https://hotcopper.com.au/data/attachments/4096/4096118-d7e0332a3197b6f940f1e1ea34086289.jpg



 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
-0.003(11.5%)
Mkt cap ! $77.51M
Open High Low Value Volume
2.5¢ 2.6¢ 2.3¢ $124.0K 5.095M

Buyers (Bids)

No. Vol. Price($)
10 2808380 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 339712 5
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.