Fair point on the geology vs mining geology.Ok if you can't wrap your head around ranges, inferences and estimations here is a simpler breakdown.
The absolute value of mining was $5.19/t. The absolute value of processing was $19.3/t. The absolute cost to break even on mining and processing the tailings combined is $15.82 at a recovery of 75%. As you so kindly pointed out its actually 50% recovery which would be about $10.54.
- Forums
- ASX - By Stock
- FFX
- Ann: High Grade Gold Results from the Morila Super Pit
Ann: High Grade Gold Results from the Morila Super Pit, page-53
-
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online