I think it is all in the wording.
The last cr will be APPLIED TOWARDS
Completion and delivery of BFS
Final design and build of electrolyte plant
Drilling Coates.
The Coates drilling has to be completed within 2 months as a condition of the $112k Gov grant.
The electrolyte plant must be built by August 2023 as a condition of the USV vanadium oxide supply. For the Commonwealth grant $3.69m the plant must be built by 31/3/24.
I can't find a date for the construction of the electrolyte plant.
Also does anyone know where the vanadium oxide is being converted to electrolyte now, is it VSUN?
- Forums
- ASX - By Stock
- AVL
- WTF BFS?
WTF BFS?, page-25
-
- There are more pages in this discussion • 49 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.001(6.67%) |
Mkt cap ! $137.7M |
Open | High | Low | Value | Volume |
1.6¢ | 1.6¢ | 1.5¢ | $19.10K | 1.215M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 11061591 | 1.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.6¢ | 6848290 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 11048258 | 0.015 |
49 | 12879594 | 0.014 |
27 | 9710595 | 0.013 |
22 | 6549383 | 0.012 |
14 | 4048548 | 0.011 |
Price($) | Vol. | No. |
---|---|---|
0.016 | 6372136 | 18 |
0.017 | 4423777 | 26 |
0.018 | 6005969 | 18 |
0.019 | 3961141 | 11 |
0.020 | 6152270 | 12 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
AVL (ASX) Chart |