amlam
one always will test a well from the bottom up if trying to test a well in the most cost effective manner.
because of the need to perforate the casing/liner to initiate flow, and the use of DST tools that operate on annulus pressure commands. you require pressure integrity of the annulus.
plus you don't really want to test and then cement squeeze the perforations before drilling ahead.
hope this makes sense
SS
- Forums
- ASX - By Stock
- MAY
- Alameda Structure's Further De-risking
Alameda Structure's Further De-risking, page-13
-
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.2¢ |
Change
0.003(10.3%) |
Mkt cap ! $107.8M |
Open | High | Low | Value | Volume |
2.9¢ | 3.2¢ | 2.9¢ | $182.4K | 5.982M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 534562 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.3¢ | 1235000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 170079 | 0.031 |
3 | 650000 | 0.030 |
6 | 521452 | 0.029 |
16 | 4741995 | 0.028 |
6 | 721597 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.033 | 1235000 | 3 |
0.034 | 114471 | 2 |
0.035 | 36623 | 2 |
0.037 | 1000000 | 1 |
0.038 | 760674 | 5 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |