STX 2.17% 22.5¢ strike energy limited

Ann: South Erregulla Success Unlocks Project Haber, page-188

  1. 1,580 Posts.
    lightbulb Created with Sketch. 3813
    Hi OT1961,
    As a previous poster has pointed out, Strike sited SE-1 off structure to prove up as much high-confidence resource as possible to underpin Haber. If the well was drilled at the crest (top) of the structure, that would prove up less resource.

    Kind regards OldGeo
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
-0.005(2.17%)
Mkt cap ! $643.6M
Open High Low Value Volume
23.0¢ 23.0¢ 22.0¢ $1.581M 7.009M

Buyers (Bids)

No. Vol. Price($)
18 840004 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 639041 6
View Market Depth
Last trade - 16.10pm 03/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.