STX 4.65% 22.5¢ strike energy limited

Ann: South Erregulla Success Unlocks Project Haber, page-216

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,851 Posts.
    lightbulb Created with Sketch. 280
    The joint venture is preparing to recommence operations at WE-3,located in the Northern Area of the field
    andseparated from the Central Area by a fault. WE-3 was temporarily suspended on 4 January 2021 at
    4,294m MDRTin the Carynginia formation after encountering high pressure readings that were close to the
    design limits of the well.Following a comprehensive review of WE-3 operations and data by both JV partners
    and external consultants, the JV has agreed that the well can be safely re-entered.TheJoint Venturehas
    finalised the well design for the re-entry into WE-3 (WE-3 ST2) and approved long lead item expenditure for
    drilling operations. It is anticipated that the Ensign 970 rig will mobilise to the WE-3 well location in H1 2022.

 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
0.010(4.65%)
Mkt cap ! $644.7M
Open High Low Value Volume
22.0¢ 23.0¢ 22.0¢ $1.056M 4.706M

Buyers (Bids)

No. Vol. Price($)
5 262128 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 3834531 37
View Market Depth
Last trade - 16.10pm 08/11/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.