The joint venture is preparing to recommence operations at WE-3,located in the Northern Area of the field
andseparated from the Central Area by a fault. WE-3 was temporarily suspended on 4 January 2021 at
4,294m MDRTin the Carynginia formation after encountering high pressure readings that were close to the
design limits of the well.Following a comprehensive review of WE-3 operations and data by both JV partners
and external consultants, the JV has agreed that the well can be safely re-entered.TheJoint Venturehas
finalised the well design for the re-entry into WE-3 (WE-3 ST2) and approved long lead item expenditure for
drilling operations. It is anticipated that the Ensign 970 rig will mobilise to the WE-3 well location in H1 2022.
- Forums
- ASX - By Stock
- STX
- Ann: South Erregulla Success Unlocks Project Haber
Ann: South Erregulla Success Unlocks Project Haber, page-216
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.5¢ |
Change
0.010(4.65%) |
Mkt cap ! $644.7M |
Open | High | Low | Value | Volume |
22.0¢ | 23.0¢ | 22.0¢ | $1.056M | 4.706M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 262128 | 22.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
23.0¢ | 3834531 | 37 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 262128 | 0.225 |
11 | 1801129 | 0.220 |
22 | 1768364 | 0.215 |
30 | 1432635 | 0.210 |
13 | 804634 | 0.205 |
Price($) | Vol. | No. |
---|---|---|
0.230 | 3810131 | 36 |
0.235 | 3080195 | 24 |
0.240 | 3294506 | 21 |
0.245 | 1454563 | 23 |
0.250 | 3412969 | 31 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online