Pretty sure they are just conditioning the hole then drilling on. Wouldn't want to set casing until after the wireline logs are run as these are open hole logs. Should find out later this week or early next week. A game of patience for us punters...
- Forums
- ASX - By Stock
- CVN
- Ann: Pavo-1 Drilling Update
Ann: Pavo-1 Drilling Update, page-131
-
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
19.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $348.8M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.5¢ | $80.01K | 402.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 1576649 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 319098 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1496649 | 0.195 |
19 | 1292005 | 0.190 |
16 | 2255955 | 0.185 |
7 | 791672 | 0.180 |
6 | 382022 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 125324 | 4 |
0.205 | 720721 | 11 |
0.210 | 565036 | 13 |
0.215 | 231747 | 6 |
0.220 | 930392 | 18 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |