KAR 3.03% $1.44 karoon energy ltd

td or no td !!, page-17

  1. 337 Posts.
    lightbulb Created with Sketch. 30
    They would have run wireline on the shallower sections already. They'll only be logging since the last casing shoe. That said mdt can take days depending on how tight the formation is. 4-5 days logging is probably a fair guess.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.