As per Ann link posted by me above, the drilling was supposed to take 3 to 4 months.
It had already commence on 9th Dec 2021, so over 3 months already.
Now if the samples were sent to the labs as they were drilled, or if they will send them all together when drilling is complete, I do not know.
Then the labs will do their testing (time depends on busy the labs are).
So there is no time frame I can see at this stage. IMO Maybe a month from now or maybe 3 months.
A good idea would be, if you can call the company and ask them. Then if you do not mind, let us know here.
Cheers
- Forums
- ASX - By Stock
- DBO
- DBO General Discussion
DBO General Discussion, page-50
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DBO (ASX) to my watchlist
|
|||||
Last
2.0¢ |
Change
0.001(5.26%) |
Mkt cap ! $2.061M |
Open | High | Low | Value | Volume |
2.0¢ | 2.0¢ | 2.0¢ | $761 | 38.02K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 0.017 |
1 | 187562 | 0.016 |
4 | 383531 | 0.015 |
1 | 90000 | 0.014 |
2 | 114997 | 0.013 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 15000 | 1 |
0.023 | 420837 | 2 |
0.024 | 72577 | 2 |
0.025 | 100000 | 1 |
0.027 | 26053 | 1 |
Last trade - 12.51pm 04/07/2024 (20 minute delay) ? |
Featured News
DBO (ASX) Chart |