  1. 2,967 Posts.
    lightbulb Created with Sketch. 6542
    Look at the DD core in the background. 15 strip's of spod on what looks to be a 2m long table so one of the most recent drill results would appear to have intersected circa 30m of Spod (assuming its Spod like nearby drilling results).

    Phase 1 of Aubry was complete as at 17 March with GTDD-22-0001 at 11.2m while GTDD-22-0002 was 10.7m. This intersection is longer than that, so its either an old photo, or a recent photo that is logging one of the most recent DD results. If its a new drill result, the likelihood is that its open in all directions. Early drill results in a new location can over-state if they hit along-strike, but very promising. As context, that's a lot longer than any of the lengths reported yesterday by LTR in its long awaited update around Anna and Northwest.

    There would appear to be three high-likelihood candidates for this drill core:
    • Phase 2 (Central Aubry) which commenced on 14 March
    • Phase 3 (Pye) which commenced on 15 March
    • Still processing what I'll call Lower North Aubry because only results from the Upper Pegmatite have been released
    Last edited by WhatsTheTip: 22/03/22
 