ELT 0.00% 8.8¢ elementos limited

Ann: Optimisation Study Oropesa Tin Project, page-12

  1. 4,212 Posts.
    lightbulb Created with Sketch. 1434
    $200m would be an absolute steal, look at the forecasted numbers!

    They would be better off getting the finance to build the mine plant themselves and payback period is very short.
    Last edited by Dabble010: 31/03/22
 
watchlist Created with Sketch. Add ELT (ASX) to my watchlist
(20min delay)
Last
8.8¢
Change
0.000(0.00%)
Mkt cap ! $18.44M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 20000 9.0¢
 

Sellers (Offers)

Price($) Vol. No.
9.3¢ 41801 1
View Market Depth
Last trade - 16.12pm 06/09/2024 (20 minute delay) ?
ELT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.