They can still produce from vertical wells though, it depends on the pressure in the reservoir I believe. Most are drilling horizontal wells as they have higher flow rates generally but maybe verticals produce at high levels in Brazil.
This is where @Ya would likely be able to help us out.
- Forums
- ASX - By Stock
- KAR
- Ann: Commitment to drill Neon control well(s)
Ann: Commitment to drill Neon control well(s), page-11
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.38 |
Change
-0.025(1.79%) |
Mkt cap ! $1.059B |
Open | High | Low | Value | Volume |
$1.39 | $1.39 | $1.36 | $3.310M | 2.414M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
40 | 161244 | $1.37 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.38 | 57647 | 39 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 158495 | 1.370 |
18 | 100743 | 1.365 |
27 | 265070 | 1.360 |
17 | 146418 | 1.355 |
38 | 287400 | 1.350 |
Price($) | Vol. | No. |
---|---|---|
1.375 | 63965 | 42 |
1.380 | 158051 | 27 |
1.385 | 156876 | 15 |
1.390 | 46278 | 9 |
1.395 | 381336 | 8 |
Last trade - 15.12pm 04/11/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |