Interview below on the 09/02/22 at the 2min 10sec mark Ed does say the drill rig is to start within 2 weeks. Maybe the drill rig was sent somewhere else or it was personnel issues.
Surely the rig will start spinning real soon. This interview is worth a listen to again as it is the first time i have ever seen Ed confident during an interview.
- Forums
- ASX - By Stock
- KWR
- Ann: Lake Goongarrie Nickel Sulphide Drilling Completed
Ann: Lake Goongarrie Nickel Sulphide Drilling Completed, page-60
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)