"Even as a worst case scenario (If they got to build their own spurr lines etc) We are looking at no more than around $50 per ton to get this material out, concentrate it, then ship it."...hey? The Dec'21 scoping study, usually the most generous study costs before reality and independent experts loom over later stduies, just reported US$350/t product... logistics alone cost $51/t. Nobody is building rail spurs around the deposit area, not the 1900's any more, ICE motors and big trucks are all the rage now
"If we are being unrealistic, the plants/machinery/infrastructure to do this will cost 2 billion dollars. And this is probably an extreme over estimation."... I'm going to stop right here. How about a bit of research and read the scoping study for a conceptual idea of what this project has to offer.
- Forums
- ASX - By Stock
- SVM
- Am i the insane one? Or am I? (SVM)
Am i the insane one? Or am I? (SVM), page-2
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVM (ASX) to my watchlist
|
|||||
Last
61.5¢ |
Change
0.030(5.13%) |
Mkt cap ! $346.2M |
Open | High | Low | Value | Volume |
59.0¢ | 62.0¢ | 59.0¢ | $138.9K | 230.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 16391 | 61.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
61.5¢ | 32999 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 16391 | 0.610 |
1 | 48504 | 0.605 |
1 | 22470 | 0.600 |
4 | 33507 | 0.590 |
1 | 5000 | 0.585 |
Price($) | Vol. | No. |
---|---|---|
0.615 | 32999 | 1 |
0.630 | 2220 | 2 |
0.645 | 2000 | 1 |
0.650 | 172082 | 5 |
0.655 | 22999 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
SVM (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online