KAR 3.06% $1.74 karoon energy ltd

Ann: WA-398-P Progress Report No 12 , page-8

  1. 12,636 Posts.
    lightbulb Created with Sketch. 526
    (ASX Code: KAR)
    ASX ANNOUNCEMENT
    WA-398-P PROGRESS REPORT NO 12
    On Tuesday the 22nd of December the Transocean Legend drilling rig was being remanned at Poseidon-2 post Cyclone
    Lawrence. The rig is currently setting anchors.
    Similarly, the postponed Poseidon 3D seismic vessel, Geowave Voyager is returning and will resume the 3D Seismic
    acquisition shortly. This survey is approximately 55% completed.
    Poseidon 2 Summary work to date
    Prior to drilling the primary target Plover Formation reservoir intervals, the well intersected an overlying reservoir
    sequence (Montara Formation) not penetrated in the Poseidon-1 well. Logging While Drilling (LWD), mud-logging and
    wireline data interpretation indicates the presence of hydrocarbons over a gross reservoir interval of approximately 20m.
    The well then penetrated the top of the Plover Reservoir interval close to prediction and intersected a thicker Plover
    Formation sequence, intersecting all of the three gross reservoir intervals seen in Poseidon-1. Approximately 60m of core
    was cut within the reservoir interval. The well was drilled to a final TD of 5356mrt which is below the estimated level of
    the Gas Water Contact (GWC) as predicted. Logging While Drilling (LWD) and mud-logging data interpretation indicated
    the presence of hydrocarbons in reservoirs above the estimated GWC. The presence of hydrocarbons cannot be
    confirmed until wireline logging and testing is completed in this zone. Due to delays caused by Cyclone Lawrence,
    wireline data has not yet been gathered over the Plover Formation reservoirs.
    Poseidon 2 - Forward plan
    Wireline logs are expected to be gathered in the coming week.
    A decision will be made on production testing once all the data is collected and analyzed.
    The objective of production testing in the Plover Reservoir here is to help estimate the possible reserves contribution of
    gas from this part of the field.
    The Transocean Legend semi-submersible rig is drilling the exploration well, which is operated by ConocoPhillips.
    Poseidon-2 is located in WA-398, on the southern flank of the north-east trending structural high of the greater Poseidon
    structure. The objective of the well is to test the extent, presence and quality of reservoirs down-dip from Poseidon-1
    where the Plover Formation is interpreted to thicken. The well had a planned total depth of approximately 5300 mRT.
    As with the recent gas discovery well, Poseidon-1, Poseidon-2 is planned to be plugged and abandoned following final
    well evaluation and production testing if applicable. These are exploration wells and are not suitable for production
    purposes.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
(20min delay)
Last
$1.74
Change
-0.055(3.06%)
Mkt cap ! $1.394B
Open High Low Value Volume
$1.88 $1.90 $1.74 $19.55M 10.90M

Buyers (Bids)

No. Vol. Price($)
3 52784 $1.74
 

Sellers (Offers)

Price($) Vol. No.
$1.75 5000 1
View Market Depth
Last trade - 16.10pm 25/07/2024 (20 minute delay) ?
KAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.