Unless the initial bulk sampling in Q3 comes up really poor, BDM have shown no signs of backing out.
Even if Blina is no good they still have the E9 alluvials, other exploration targets and finally the pipes to evaluate.
They have fully committed to down stream processing with the facility in Perth operational and will want to start feeding it with their own product asap!
When Blina was originally worked on, they just trenched the entire width of the gravel bed, with the new technology they may only need to dig 20% a huge cost saving, on top of that diamond prices are more than 30% higher than when BDM purchased.
- Forums
- ASX - By Stock
- GIB
- GIB - Diamond in the rough
GIB - Diamond in the rough, page-238
-
- There are more pages in this discussion • 298 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GIB (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.614M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 52 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 13702 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 52 | 0.038 |
1 | 28799 | 0.036 |
1 | 127600 | 0.035 |
1 | 19384 | 0.034 |
1 | 32000 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 13702 | 1 |
0.050 | 120000 | 1 |
0.070 | 30000 | 1 |
0.079 | 22000 | 1 |
0.080 | 29200 | 2 |
Last trade - 16.12pm 13/09/2024 (20 minute delay) ? |
Featured News
GIB (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online